Taps and Meter

Rudy Moreno, Deputy Assistant Director

 

pwelogo sm

About Taps & Meters The Taps & Meters Group reviews residential and commercial plans for compliance with the WCR Letters, permits water meters and sewer connections, and processes water meter easement documents. Taps & Meters also maintains a current list of approved contractors to install small water meters.

 

SMALL WATER METERS

 

 

New Rate: Effective 01/01/2017
METER SIZE & PRICE

5/8"

$239.21

1"

$319.47

1 1/2"

$485.02

2"

$617.15

1 1/2" BF

$722.65

2" BF

$680.66

ENLARGEMENT & PRICE

5/8" TO 1"

$164.12

5/8" TO 1 1/2"

$302.37

5/8" TO 2"

$434.50

1" TO 1 1/2"

$222.11

1" TO 2"

$354.24

1 1/2" TO 2"

$215.99

5/8" TO 1 1/2" BF

$540.00

5/8" TO 2" BF

$498.01

1" TO 1 1/2" BF

$459.74

1" TO 2" BF

$417.75

1 1/2" TO 2" BF

$279.50

   
Relocation

$83.86

Cut & Plug

$83.86

 

 

ο List of City Approved Contractors to Install Small Water Meters (.pdf file)

ο Small Water Meter Application (.pdf file)

ο On-Line Water Meter Application

ο Large Job Requirements by Permit Type (.pdf file)

ο Sewer Tap Requirements (.pdf file)

 

LARGE JOBS

 

Easement Dedication Process and 584 Form (.pdf)
Large Job Permit Number Request Form (.pdf)
Surface Restoration Bond (.pdf)
Maintenance Bond (.pdf)
Non-Developer Participation Contract Payment Bond (.pdf)
Non-Developer Participation Contract Performance Bond (.pdf)

 

 

UTILITY INSTALLATION WITHIN TXDOT RIGHT-OF-WAY

 

In accordance with the Texas Administrative Code Title 43, Part 1, the City of Houston will request a permit from TxDot for utility connection to City of Houston utility located within TxDot right-of-way.

 

TxDot Permit Application Form

TxDot Water Details

TxDot Sanitary Sewer Details

TxDot right-of-way Map

 

For additional information on any of these procedures, please email questions to TapTechs@houstontx.gov.

 

Public Works Spotlight

houston Bikeway program

© 2017. All rights reserved. City of Houston